PANEL ATS
The testing was conducted to determine the starting time of the engine until is ready toload. Duration time for the starting test is 10 minutes Protection test was performed to determine the machine before receiving the load.
Protection test included engine and generator test Governor test should be done along with respective governor control. At 50% and 100% load is releases suddently
Model | BMGS.013LSP5 |
Mitsubishi Engine | S3L2 |
Alternator | LSA 40 VS1 / 4P |